CBP Announces Opening of New Temporary Processing Facility in Otay Mesa, California

US Border Patrol

SAN DIEGO — U.S. Customs and Border Protection today announced the opening of a new soft-sided facility in Otay Mesa, California. The facility’s primary purpose is to safely and expeditiously process individuals in U.S. Border Patrol custody.

CBP consistently evaluates operational requirements to determine if additional temporary facilities will be needed. The new facility on Pogo Road, will have a holding capacity of approximately 500. 

The facility is weatherproof, climate-controlled, and is expected to provide ample areas for eating, sleeping, and personal hygiene.  The new facility’s design is similar to that of recently constructed soft-sided facilities.  The temporary 130,786-square-foot facility will provide additional processing capacity for Border Patrol’s San Diego Sector.


For CBP images of the new San Diego Sector Border Patrol soft-sided facility, see link below: 

Stills:
https://www.dvidshub.net/feature/TempSoftSidedFacilities

Broll:
DVIDS – Video – B-roll Otay Mesa Soft Sided Facility (dvidshub.net)
 

You appear to be using an ad blocker

Shore News Network is a free website that does not use paywalls or charge for access to original, breaking news content. In order to provide this free service, we rely on advertisements. Please support our journalism by disabling your ad blocker for this website.