Fans stranded after usher concert - a disabled nj transit train carrying about 700 passengers was towed to penn station after riders spent nearly two hours stranded inside the hudson river tunnel.
Fans Stranded After Usher Concert - A disabled NJ Transit train carrying about 700 passengers was towed to Penn Station after riders spent nearly two hours stranded inside the Hudson River tunnel.

NJ Transit Still Silent After HundredsStranded in Hudson Tunnel After MetLife Concert Before Rescue

Posted by
2 mins read
August 10, 2026
About 700 NJ Transit passengers, many returning from concerts at MetLife Stadium, were trapped for nearly two hours in a disabled train beneath the Hudson River before crews safely brought the train into Penn Station.

NEW YORK, N.Y. – Hundreds of NJ Transit riders endured a long, uncomfortable wait early Saturday morning after a train carrying approximately 700 passengers lost power and became stranded inside the Hudson River tunnel while traveling toward New York Penn Station.

Many of the passengers were returning home to New Jersey after attending concerts featuring Chris Brown and Usher at MetLife Stadium, one of the busiest concert venues in the region.

“We smelled smoke, like rubber burning, then the train stopped,” one passenger said. “Then the power went out.”

Two hours later, a second engine pulled the train out of the tunnel.

“They wanted us to walk, but they scrapped the plan,” she said.

Nj transit trains at hoboken railyard.

NJ Transit has not released a statement regarding the incident. The transit authority has been plagued with problems in its network that have led to delays and transportation outages in one of the busiest sections of rail in the United States between New Jersey and New York City.

NJ Transit shares much of its busier track network with Amtrak. Outdated catenary overhead power lines and centuries-old signal/tunnel infrastructure frequently fail, causing massive cascading delays through the Hudson River tunnels and into NYC Penn Station.

R&b singer chris brown.

The incident began around 2 a.m., when passengers reported smelling something burning moments before the train lost power and came to a stop beneath the Hudson River.

Riders trapped in sweltering conditions

With electrical power cut off, air conditioning and ventilation inside the train stopped working, leaving hundreds of passengers sitting in hot, humid conditions for nearly two hours.

One passenger said there was “a smell of something burning” just before the train came to a halt and the lights and power failed.

The disabled train remained stuck in one of the nation’s busiest rail corridors as emergency responders worked to determine the safest way to remove passengers.

Usher.

Walking passengers through tunnel deemed too risky

Firefighters from the FDNY responded to Penn Station as officials considered evacuating passengers by having them walk along the tracks through the tunnel.

That plan was ultimately abandoned because of the logistical and safety challenges involved in moving roughly 700 people through the confined tunnel environment.

Instead, crews dispatched a rescue diesel locomotive, which coupled to the disabled train and slowly towed it into Penn Station at approximately 3 a.m.

No injuries were reported.

The disruption comes as NJ Transit continues to serve tens of thousands of riders traveling to and from major events at MetLife Stadium. The rail line is a critical transportation link for North Jersey commuters and concertgoers, particularly during busy summer weekends when trains often operate near capacity.

Officials have not yet announced what caused the apparent electrical failure.

Key Points

  • About 700 NJ Transit passengers were stranded inside the Hudson River tunnel after a train lost power.
  • Many riders were returning to New Jersey after Chris Brown and Usher concerts at MetLife Stadium.
  • Passengers were rescued after a diesel locomotive towed the disabled train into Penn Station.

FAQ

  • When did the train become disabled?
    Around 2 a.m. Saturday while traveling toward Penn Station.
  • How many people were on board?
    Approximately 700 passengers.
  • Why weren’t passengers evacuated through the tunnel?
    Officials determined walking hundreds of passengers through the tunnel posed significant logistical and safety challenges.
  • How was the train rescued?
    A diesel locomotive was dispatched to tow the disabled train into Penn Station.
  • Were there any injuries?
    No injuries were reported.

Source: NJ Transit, FDNY, passenger accounts

Phil Stilton is the Editor and Publisher of Shore News Network, an independent digital newsroom providing original reporting on New Jersey, national news, government, public policy, public safety, courts, and community affairs.

As founder of the publication, Stilton leads editorial strategy, investigative reporting, and daily newsroom operations while overseeing coverage that reaches millions of readers annually.

With extensive experience covering municipal government, county government, state legislatures, elections, law enforcement, emergency management, and public records, Stilton specializes in translating complex government actions into clear, factual reporting. His work frequently relies on primary source documents, including court filings, legislation, public meeting records, election finance disclosures, government databases, police reports, and Freedom of Information and Open Public Records Act (OPRA) requests. He has reported extensively on local government accountability, taxpayer spending, campaign finance, public corruption investigations, infrastructure, public safety, and the policies affecting New Jersey residents.

Under Stilton's editorial leadership, Shore News Network has grown into one of New Jersey's largest independent digital news organizations, publishing thousands of original news articles each year while providing breaking news coverage, investigative reporting, and analysis across state and local government. The publication's reporting is routinely sourced from official government agencies, public officials, court records, and firsthand documentation, with a commitment to transparency, attribution, corrections when warranted, and clearly distinguishing factual reporting from opinion.

Stilton's journalism follows established newsroom standards emphasizing accuracy, verification, fairness, and accountability. Every effort is made to verify information through official records and multiple reliable sources before publication. His reporting is intended to provide readers with timely, well-documented information that helps them understand the issues affecting their communities, while maintaining editorial independence from political parties, government agencies, advocacy organizations, and commercial interests.

Readers can submit story tips, corrections, public records, or media inquiries through the official Shore News Network website or its verified social media channels. Shore News Network welcomes corrections and updates when new information becomes available as part of its ongoing commitment to accurate and transparent journalism.

Don't Miss

Exit mobile version