TOMS RIVER – The Haverfield Corporation will begin comprehensive visual inspections on the 230KV transmission lines in the JCP&L Region in Toms River.
The inspections will take three to four weeks, with completion expected at the end of January. The helicopter inspections will take place at slow speed along the power lines. The helicopter will often hover and/or circle for a closer inspection of lines and structures.
The helicopter being used in the inspections is black with red lettering MD500 and a registration or tail number N8330P.
Photo by Phil Stilton / Shore News Network
Community News
Why Is There a Giant Yellow Robot on the Side of the Road in Belmar?
Shore News Network
Community News
America’s Oldest Dinosaur Is in Ocean County — and It Needed a Neck Job
Shore News Network
Community News
Plans for 450 Homes At Former Circus Liquors Revealed
Shore News Network
Community News
Shore News Network Staff Report
Shore News Network Staff Report is used for collective news coverage produced by multiple members of the newsroom. These reports may include reporting, research, updates and editorial contributions from several writers and editors rather than a single credited author. Each report is reviewed and published by the Shore News Network editorial team.
Learn More About Shore News Network Staff Report →